Showing posts with label GC BOW wk 2. Show all posts
Showing posts with label GC BOW wk 2. Show all posts

9.9.12


 Did it. It took about eight hours but that included breakfast, shower, and lunch so I think maybe six hours and change.
Definitely had challenges this week and I am glad I am finished. I will have to have some sort of square in a square treatment or variable frame between sashings if these are to be in the same quilt as last week's.